VETUS Wiper blade, stainless steel (AISI 316), L= 508 mm WBS51

The metal parts of the blade are high-gloss polished S/S. This blade will fit almost all makes/types...
SKU: WBS51
Availability: Many In Stock
$37.00
$37.00

zip Disclaimer

zip
Limited-Time Offers, End in: 151D 8H 23M 0S
Subtotal: $37.00
10 customers are viewing this product
VETUS Wiper blade, stainless steel (AISI 316), L= 508 mm WBS51

VETUS Wiper blade, stainless steel (AISI 316), L= 508 mm WBS51

$37.00

VETUS Wiper blade, stainless steel (AISI 316), L= 508 mm WBS51

$37.00

Related Products